§IMPORTANT:
Golden
Phoenix stone is a latest building material and its application
and construction method differ greatly from that of natural
stone. Precautions shall be paid for construction of the micro
crystal porcelain tiles.
1. Protection
of surface protective film: The surface protective film pasted
ex works can resist pollution and prevent scoring by sand grains.
And it can be removed only after the completion of the project
and being thoroughly cleaned.
2.
Cutting: the micro crystal porcelain tiles have high hardness
and density with texture like jade. Therefore, diamond saw blade
would be worn and thus even causing damages in cutting. To this
end, following measures should be taken in cutting:
(1) Give priority to stable desktop saw cutter with brand
diamond saw blade for micro crystal porcelain tiles. If unavailable,
marble cutter instead of granite cutter with diamond saw blade
could be applied.
(2) Ensure sufficient cooling water to prevent damage
or explosive disruption to saw blade caused by overheat.
(3) Always keep the saw blade forward in one way
and draw it back after tiles have been removed to prevent accidental
damages to the crystallite glass when returning.
(4) Handheld electric marble saw is hard to operate
and should be operated by trained and experienced workers. Ensure
cooling water injected aim at the moving cut point all the time.
Cut a shallow slot first as a guiding slot for following cutting
to ensure smooth cutting and avoid damages caused by swinging
of the blade.
(5) Due to high wearing of the cutting edge, the
blade should be edged timely to ensure the sharpness of the
diamond cutting edge. Whichever cutter you choose, excellent
edging materials should be ensured. And common refractory fireclay
block is recommended.
3.
Laying: organic
binding tiles with appropriate flexibility are recommended.
Application of traditional slush technique in laying on the
floor may cause cracks to some files. In view of this, improving
measures are as follows:
(1) It is necessary to add sawdust of proper amount
to both bedding of the slush and plain cement directly pasted
to the bottom of the bricks.
(2) As regards the type of cement, the strength
of the Portland cement for the bedding should be lower than
400#, and better to be 350#. Plain cement should apply 275#
white cement.
(3) Recommended amount of addition of saw dust is
respectively 10-15% and 5-7% for bedding slush and plain cement
and should be applied according to specified amount after on-site
test for specific engineering situations. On the premise of
not influencing mixing performance, the amount should be as
large as possible. Add a little 107 liquid cement if necessary.
(4) Brickwork joint should be washed clean before
joint filling. Paste the four sides of the tile along the joints
with color protective paper and then carry out the operation
with appropriate filler. |
|
 |
| |
Copyright © 2006 Sh-goldenphoenix.com,
All rights reserved.
Add :Rm. 1011, 2# Changfeng No.2 Quarter, Jinshajiang Rd., Putuo Dis.,
Shanghai,P.R.China 200062
Tel:0086-21-62541619 Fax:0086-21-62541619 E-mail:market@sh-goldenphoenix.com |
|
|
|
|